OPTGP.Operations Test Group
 
  Resource Details
 
  Title:
  Smithfield Operations Group
  Office Phone:
  (985) 674-5968
  E-mail Address:
  operations@smithfield.org
  Roles:
  Operations and Controls
  Primary Role:
  Facilities Operation
 
  Assigned Activities
  Project ID
  Activity ID
  Activity Name
  Status
  Role
  Prim Rsrc
  NRG00870
  02389805ZZ
  PERFORM HYDRO TEST ON MAIN STEAM TRAP STATION
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  02456541ZZ
  REPLACE STEAM TRAP LPT-6 CONDENSER 31 LPSD
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60354002ZZ
  REPLACE SWN-TCV-1113 VALVE,  STEAM PACKING LEAK
  Not Started
  Operator
OPTGP.Operations Test Group
  NRG00870
  60354002ZZ
  REPLACE SWN-TCV-1113 VALVE,  STEAM PACKING LEAK
  Not Started
  Operator
OPTGP.Operations Test Group
  NRG00870
  60772900ZZ
  REPLACE VALVE 5EX-FCV-1210, LEAKS BY SEAT
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60788900ZZ
  REPAIR INTERNAL LEAK FOR VALVE 5EX-FCV-1206
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60788900ZZ
  REPAIR INTERNAL LEAK FOR VALVE 5EX-FCV-1206
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60788902ZZ
  RETEST FOR FCV-1210 VALVE SEAT LEAK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60788902ZZ
  RETEST FOR FCV-1210 VALVE SEAT LEAK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60788903ZZ
  INSPECT / REPAIR SUSPECTED LEAK BY ON VALVE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  60788903ZZ
  INSPECT / REPAIR SUSPECTED LEAK BY ON VALVE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  70554100ZZ
  PM 2HD-LCV-1138, 32A FWH TO 33 CONDENSER HI-HI
  Not Started
  Operator
OPTGP.Operations Test Group
  NRG00870
  70554100ZZ
  PM 2HD-LCV-1138, 32A FWH TO 33 CONDENSER HI-HI
  Not Started
  Operator
OPTGP.Operations Test Group
  NRG00870
  70554101ZZ
  POST WORK TEST ON 2HD-LCV-1138,  STROKE AND ISLT
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  70554101ZZ
  POST WORK TEST ON 2HD-LCV-1138,  STROKE AND ISLT
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  80162501ZZ
  POST WORK TEST AFTER REPACK ON VALVE BFD-FCV-437
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  80162501ZZ
  POST WORK TEST AFTER REPACK ON VALVE BFD-FCV-437
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10007
  DECREASE GEN LOAD TO 40 MW; XFER HOUSE LOADS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10007
  DECREASE GEN LOAD TO 40 MW; XFER HOUSE LOADS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10009
  SECURE SECOND CONDENSATE PUMP
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10009
  SECURE SECOND CONDENSATE PUMP
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10010
  REDUCE REACTOR POWER TO LESS THAN 4% - (MODE 2)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10010
  REDUCE REACTOR POWER TO LESS THAN 4% - (MODE 2)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10011
  BREAKER OPEN, START THE OUTAGE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10011
  BREAKER OPEN, START THE OUTAGE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10017
  ESTABLISH H2 TO MAIN TURNINE GENERATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO10017
  ESTABLISH H2 TO MAIN TURNINE GENERATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20005
  CLOSE MAIN STEAM ISOLATION VALVES (MSIVS)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20005
  CLOSE MAIN STEAM ISOLATION VALVES (MSIVS)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20006
  SECURE CONDENSER AIR REMOVAL SYS, BREAK VACUUM
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20006
  SECURE CONDENSER AIR REMOVAL SYS, BREAK VACUUM
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20006A
  REMOVE TURBINE FROM TURNING GEAR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20006A
  REMOVE TURBINE FROM TURNING GEAR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO20006B
  PLACE MAIN TURBINE ON GEAR AFTER OUTAGE WORK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30001
  INSERT CONTROL BANK RODS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30001
  INSERT CONTROL BANK RODS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30002
  INSERT SHUTDOWN BANK RODS (MODE 3 ENTRY)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30002
  INSERT SHUTDOWN BANK RODS (MODE 3 ENTRY)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30003
  ADJUST BORON CONCENTRATION TO HSD XENON FREE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30003
  ADJUST BORON CONCENTRATION TO HSD XENON FREE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30004
  SHUTDOWN ROD DRIVE MG SETS AS PER SOP-RC-2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30004
  SHUTDOWN ROD DRIVE MG SETS AS PER SOP-RC-2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30005
  BORATE TO COLD SHUT DOWN CONCENTRATION
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30005
  BORATE TO COLD SHUT DOWN CONCENTRATION
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30012
  ESTABLISH N2 TO THE PORVS PER SOP-SI-1 (VIA 34)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30012
  ESTABLISH N2 TO THE PORVS PER SOP-SI-1 (VIA 34)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30013
  PERFORM INITIAL CONTAINMENT RADIATION SURVEY
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30013
  PERFORM INITIAL CONTAINMENT RADIATION SURVEY
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30014
  PLACE RHR IN SERVICE PER SOP-RHR-1
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30014
  PLACE RHR IN SERVICE PER SOP-RHR-1
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30015
  COOLDOWN RCS TO LESS THAN 200 DEGREES (MODE 5)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO30015
  COOLDOWN RCS TO LESS THAN 200 DEGREES (MODE 5)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40001
  DEPRESSURIZE RCS TO APPROX 1700 PSI
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40001
  DEPRESSURIZE RCS TO APPROX 1700 PSI
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40003
  DEPRESSURIZE RCS TO 800 PSIG
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40003
  DEPRESSURIZE RCS TO 800 PSIG
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40005
  DEPRESSURIZE RCS TO 350 PSIG
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40005
  DEPRESSURIZE RCS TO 350 PSIG
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40006
  WARM AND MIX RHR SYSTEM AND CHEMICAL SAMPLE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40006
  WARM AND MIX RHR SYSTEM AND CHEMICAL SAMPLE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40007
  COOLDOWN RCS TO 190 TO 180 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO40007
  COOLDOWN RCS TO 190 TO 180 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50012
  MANAGEMENT APPROVAL TO EXCEED COLD SHUTDOWN
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50012
  MANAGEMENT APPROVAL TO EXCEED COLD SHUTDOWN
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50013
  REMOVE RHR FROM SERVICE,  3PT-CS04
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50013
  REMOVE RHR FROM SERVICE,  3PT-CS04
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50014
  RAISE RCS PRESSURE 400-1000
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50014
  RAISE RCS PRESSURE 400-1000
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50015
  HEATUP RCS TO 335-345 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50015
  HEATUP RCS TO 335-345 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50016
  PRESSURIZE SI ACCUMULATORS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50016
  PRESSURIZE SI ACCUMULATORS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50017
  RCS TEMP GREATER THAN 350 DEGREES (MODE 3 ENTRY)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50018
  HEATUP RCS TO 360-375 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50019
  RAISE RCS PRESSURE TO 1800 PSI
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50019
  RAISE RCS PRESSURE TO 1800 PSI
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50019
  RAISE RCS PRESSURE TO 1800 PSI
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50019
  RAISE RCS PRESSURE TO 1800 PSI
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50020
  HEATUP RCS TO 390-410 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50020
  HEATUP RCS TO 390-410 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50021
  HEATUP RCS TO 440-460 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50021
  HEATUP RCS TO 440-460 DEGREES
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50023
  VERIFY RCS ACTIVITY IN SPEC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50023
  VERIFY RCS ACTIVITY IN SPEC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50024
  CLOSE-OUT CONTAINMENT PRIOR TO CRITICALITY
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50024
  CLOSE-OUT CONTAINMENT PRIOR TO CRITICALITY
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50025
  PFM-49, SAT FOR CRITICALITY
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50025
  PFM-49, SAT FOR CRITICALITY
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50026
  PLACE ROD CONTROL SYS IN SERVICE PER SOP-RC-1
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50026
  PLACE ROD CONTROL SYS IN SERVICE PER SOP-RC-1
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50027
  RCS AT OPERATING PRESSURE & TEMPERATURE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50027
  RCS AT OPERATING PRESSURE & TEMPERATURE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50028
  CLOSE REACTOR PROTECTION SYSTEM TRIP BREAKERS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO50028
  CLOSE REACTOR PROTECTION SYSTEM TRIP BREAKERS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60001
  EXIT POP-1.1 & ENTER POP-1.2, REACTOR START-UP
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60001
  EXIT POP-1.1 & ENTER POP-1.2, REACTOR START-UP
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60002
  ADJUST BORON FOR CRITICALITY PER POP-1.2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60002
  ADJUST BORON FOR CRITICALITY PER POP-1.2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60003
  WITHDRAW SHUTDOWN RODS PER POP-1.2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60003
  WITHDRAW SHUTDOWN RODS PER POP-1.2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60004
  WITHDRAW CONTROL BANK RODS PER POP-1.2
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60005
  VERIFY RCS CHEMISTRY IS IN SPEC PER RCS-6
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60005
  VERIFY RCS CHEMISTRY IS IN SPEC PER RCS-6
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60008
  VERIFY RCS CHEMISTRY IN SPEC PER SOP-RCS-6
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60008
  VERIFY RCS CHEMISTRY IN SPEC PER SOP-RCS-6
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60009
  DRAW VACUUM IN MAIN CONDENSER USING MAIN STEAM
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60009
  DRAW VACUUM IN MAIN CONDENSER USING MAIN STEAM
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60010
  HEAT UP MAIN TURBINE GENERATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60010
  HEAT UP MAIN TURBINE GENERATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60011
  HOLD FOR CHEMISTRY AT 0-2% POWER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60011
  HOLD FOR CHEMISTRY AT 0-2% POWER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60012
  VERIFY STEAM GENERATOR CHEMISTRY IS IN SPEC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60012
  VERIFY STEAM GENERATOR CHEMISTRY IS IN SPEC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60013
  INCREASE REACTOR POWER TO 2-5% (MODE 1 ENTRY)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60013
  INCREASE REACTOR POWER TO 2-5% (MODE 1 ENTRY)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60014
  INCREASE REACTOR POWER TO 5-10%
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60014
  INCREASE REACTOR POWER TO 5-10%
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60015
  BRING CONDENSATE OXYGEN INTO SPEC FOR MAIN
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60015
  BRING CONDENSATE OXYGEN INTO SPEC FOR MAIN
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60016
  SWAP FROM AUX FEEDWATER TO MAIN FEEDWATER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60016
  SWAP FROM AUX FEEDWATER TO MAIN FEEDWATER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60017
  ROLL THE TURBINE GENERATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60017
  ROLL THE TURBINE GENERATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60019
  SYNC TURBINE TO THE GRID / BREAKER CLOSED
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60019
  SYNC TURBINE TO THE GRID / BREAKER CLOSED
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60020
  RAISE RX POWER FROM 15% TO 20%
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60020
  RAISE RX POWER FROM 15% TO 20%
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60021
  SWAP FEEDWATER FROM MANUAL TO AUTOMATIC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60021
  SWAP FEEDWATER FROM MANUAL TO AUTOMATIC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60023
  RAISE RX POWER FROM 25% TO 30%
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60024
  PERFORM SOP-RPC-6, REACTOR THERMAL PWR CALC
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  FO60025
  INCREASE RX POWER FROM 30% TO 100%
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980003H
  HANG SAFETY TAG (PTO'S) FOR FEED REG VALVE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980003H
  HANG SAFETY TAG (PTO'S) FOR FEED REG VALVE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980003R
  REMOVE SAFETY TAG (PTO'S) FOR FEED REG VALVE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980003R
  REMOVE SAFETY TAG (PTO'S) FOR FEED REG VALVE
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980010H
  HANG SAFETY TAG (PTO) FOR CH-MOV-250B WORK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980010H
  HANG SAFETY TAG (PTO) FOR CH-MOV-250B WORK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980010R
  REMOVE SAFETY TAG (PTO) FOR CH-MOV-250B
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980010R
  REMOVE SAFETY TAG (PTO) FOR CH-MOV-250B
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980011H
  HANG SAFETY TAG (PTO) FOR CH-MOV-250D (BLUE)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980011H
  HANG SAFETY TAG (PTO) FOR CH-MOV-250D (BLUE)
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980011R
  REMOVE SAFETY TAG (PTO) FOR MOV-250
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980011R
  REMOVE SAFETY TAG (PTO) FOR MOV-250
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980017H
  HANG SAFETY TAG (PTO) FOR BIT HEADER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980017H
  HANG SAFETY TAG (PTO) FOR BIT HEADER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980017R
  REMOVE SAFETY TAG (PTO) FOR BIT HEADER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980017R
  REMOVE SAFETY TAG (PTO) FOR BIT HEADER
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980027H
  HANG SAFETY TAG (PTO) FOR MBFP MAIN OIL PUMP
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980027R
  REMOVE SAFETY TAG (PTO) FOR #31  MBFP  MAIN OIL
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980027R
  REMOVE SAFETY TAG (PTO) FOR #31  MBFP  MAIN OIL
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980029H
  HANG SAFETY TAG (PTO) FOR CH-107
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980029H
  HANG SAFETY TAG (PTO) FOR CH-107
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980029R
  REMOVE SAFETY TAG (PTO) FOR CH-107
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980029R
  REMOVE SAFETY TAG (PTO) FOR CH-107
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980031H
  HANG SAFETY TAG (PTO) FOR 33 INVERTER WORK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980031H
  HANG SAFETY TAG (PTO) FOR 33 INVERTER WORK
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980032H
  HANG SAFETY TAG (PTO) FOR 31 ACCUMULATOR CALS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980032H
  HANG SAFETY TAG (PTO) FOR 31 ACCUMULATOR CALS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980032R
  REMOVE SAFETY TAG (PTO) AFTER 31 ACCUMULATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980032R
  REMOVE SAFETY TAG (PTO) AFTER 31 ACCUMULATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980033H
  HANG SAFETY TAG (PTO) FOR 32 ACCUMULATOR CALS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980033H
  HANG SAFETY TAG (PTO) FOR 32 ACCUMULATOR CALS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980033R
  REMOVE SAFETY TAG (PTO) AFTER 32 ACCUMULATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980033R
  REMOVE SAFETY TAG (PTO) AFTER 32 ACCUMULATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980034H
  HANG SAFETY TAG (PTO) FOR 33 ACCUMULATOR CALS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980034H
  HANG SAFETY TAG (PTO) FOR 33 ACCUMULATOR CALS
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980034R
  REMOVE SAFETY TAG (PTO) AFTER 33 ACCUMULATOR
  Not Started
   
OPTGP.Operations Test Group
  NRG00870
  OPS980034R
  REMOVE SAFETY TAG (PTO) AFTER 33 ACCUMULATOR
  Not Started
   
OPTGP.Operations Test Group